Parrallel and Grid-connection Application of Gas Genset-Smartgen,Genset Controller,Generator Controller,ATS Controller,panel manufactory,ats manufaction,battery charger manufactory,battery charger,genset control panel,engine heater,engine controller,marine engine control module,marine diesel control module,boat engine controller,marine engine control module,marine engine controller 






Parrallel and Grid-connection Application of Gas Genset

2020-03-05


This case involves the use of SmartGen's HGM9510 parallel control module that can realize multi-units parallel connection; HGM9560 multi-units grid-connection control module can realize parallel connection of power generation and mains supply. With the cooperation of the two, it can meet the requirement of multi-units parallel connection and grid-connection with mains supply, realizing the application of the constant power output and the shear peak of the units.


The operation data of the two units are as follows


The first unit, accumulative power: 1204.4 MWH; power factor: 0.89; accumulative running time: 10,528 hours.

The second unit, accumulative power: 795.4mwh; power factor: 0.77; accumulative running time: 10,528 hours.

1.jpg

1-1.jpg


Site Photos

2.jpg

2-1.jpg

2-2.jpg


Grid-connection diagram of the two units

3.jpg


Constant power output: the maximum active power output of the genset is what the setting active power output of the geneset. When the gensets and the mains supply are connected in parallel successfully, the power generation begins to output the load. When the active power output of the power generation reaches 100%, the remaining load is carried by the mains supply, which can also be considered the power generation as main use. When the load is less than the setting value of active power output of the power generation, the mains supply begins to soft unload tripping.


Mains supply shear peak: mains supply first starts with load, when the active power output reaches 100% of setting value, the control module is in automatic mode, gensets start automatically, closing and paralleling with mains supply after normal operation, units start soft unloading, receiving the rest of load, when the load is lower than the setting value of active power output of mains, the units stops for soft unload tripping.


www.smartgen.cn

4.jpg






SmartGen Internet +



Cloud Monitoring Platform

Control your genset at any time


English WeChat Service

Scan QR code to get information in time


SmartGen Products APP

Get products information in real time


Smartgen Media

Acquire trends of SmartGen at any time











WEB:中文·繁体·English·Taobao

TEL:0086-371-67988888/67981888  FAX:0086-371-67992952

ADD:No.28 Jinsuo Road, Zhengzhou City, Henan Province, China

E-MAIL:sales@smartgen.cn

Business Partner:Woodward

Copyright© Since 1998 SmartGen




Smartgen Media:Facebook . Twitter . Linkedin . Odnoklassniki . VK . Reddit . Medium . Blogger . Wordpress . Tumblr . Ameba . Naver . YouTuBe . Pinterest . Site123 . Nifty . Mix Wixsite


HAND-IN-HAND WITH YOU, WIN-WIN IN FUTURE.